Tag: 1100

Chinese firm to build $2.4b 1,100-MW Kohala hydroelectric project

| | No Comments

article image STAFF REPORT MUZAFFARABAD: The China Three Gorges Corporation (CTGC) will develop the planned 1,100-MW Kohala hydropower project, a run-of-river scheme that will be built on the Jhelum River in AJK. The project with the cost of $2.4 billion is scheduled for commission in 2023. The Kohala hydroelectric scheme will have a gravity, roller-concrete compacted dam on the upper branch of the Jhelum, 40 km from Muzaffarabad. The powerhouse, on the lower branch of the Jhelum near Barasala…Read More

1,100 SSUET students awarded degrees at convocation

| | No Comments

article image STAFF REPORT KHI: Sir Syed University of Engineering and Technology Chancellor Engr Adil Usman has said that their university has undertaken concerted efforts and turned out over 13,000 graduates, so far, who are capable to meet the demand of modern world. He was addressing the SSUET graduates at the university’s 18th Convocation that was held to commemorate academic accomplishments of its students at the Expo Centre Karachi in which some 1100 students from the various disciplines were…Read More