Tag: Karot

720MW Karot hydropower project to be ready by 2020

| | No Comments

article image STAFF REPORT ISB: The run-of-river Karot Hydropower Project, with concrete gravity dam having installed capacity of producing 720 MW power would be completed by 2020. The project is planned on Jhelum River near Karot Village 3 Kilometers (KM) downstream of Azad Pattan Bridge. The surface area of the new reservoir at full water level is 4,210,000m. The Project is considered with shorter headrace tunnel, underground power house and long tail race tunnel/channel implying four Francis…Read More