3D-printed electrical room starts operation in China

A power distribution room built with 3D printing technology has started operation in Guangzhou, capital of southern China’s Guangdong Province.

3D-printed electrical room starts operation in China

The electrical room, the first of its kind nationwide, measures 12.1 meters long, 4.5 meters wide and 4.6 meters high. It was built using a 3D printer according to a digital 3D model, said Wu Xiaofei with the power supply bureau in Guangzhou.

interesting reading:  PM inaugurates Pakistan’s 1st Science and Technology Park NSTP

Wu said construction of the room started last December and took a total of 35 days to complete, cutting the normal construction time by 30 percent.

interesting reading:  KP becomes first Province pass STI Policy

The printer only required one operator and two other workers to assist with the printing, while manual construction of the room usually requires more than five workers, he added.

Besides, the printer reduced the dust and waste produced during the construction.

interesting reading:  PTCL starts breast cancer awareness campaign in Oct

3D printing technology will be used as an efficient, intelligent and eco-friendly way for construction as Guangzhou is ramping up efforts to expand its power supply networks, Wu said. 

READ MORE :

China Desk
Author: China Desk

One thought on “3D-printed electrical room starts operation in China

Leave a Reply