The 1,124 MW Kohala Hydro power project is likely to be completed by December 2025 with the cost of $2.4 billion.

Kohala Hydro power project to complete by 2025

The annual generation capacity of run-of-the-river project is 4,800 GWh, said an official source. Kohala Hydro power project, The diversion dam site is on Jhelum River near Sarran Village 40 km upstream from Muzaffarabad and a 20 km long tunnel connects to the powerhouse which is located at Barsala, 7 km upstream from Kohala Bridge. The Kohala hydroelectric scheme will have a gravity, roller-concrete compacted dam on the upper branch of the Jhelum, 40 km from Muzaffarabad. The powerhouse, on the lower branch of the Jhelum near Barasala, will house four 281-MW Pelton turbines. Kohala Hydro power project  Chinese state owned hydropower developer, namely China Three Gorges Corporation’s (CTGC), largest investment in Pakistan. It won the right to develop a hydroelectric dam in Pakistan on January 7, 2015. The high head project of 316 meters that is located near Kohala, in Azad Kashmir.

Source: This news is originally published by app

By Web Team

Technology Times Web team handles all matters relevant to website posting and management.