Tag: 1320
Second phase of 1320 MW Sahiwal Coal Power Project inaugurated
August 10th, 2015 | Technology Times | No Comments
STAFF REPORT SAHIWAL: Pakistan massive 3.3 billion tonnes of coal deposits are still not utilized up to the potential and only 3.4 million tonnes per year are used for energy production. The Sahiwal Coal Power Project by Government of Punjab is the continuity of enhancing coal power production in the country in order to reduce the energy crisis in Pakistan. The second phase of the Sahiwal Power Project 1320MW inauguration took place.
The Chief Minister Punjab, Shehbaz Sharif…Read More
The inauguration of 2nd phase of 1320 MW Sahiwal Coal Power Project takes place
August 3rd, 2015 | Ahsan Jamil | No Comments
STAFF REPORT SAHIWAL: Pakistan massive 3.3 billion tonnes of coal deposits are still not utilized up to the potential and only 3.4 million tonnes per year are used for energy production. The Sahiwal Coal Power Project by Government of Punjab is the continuity of enhancing coal power production in the country in order to reduce the energy crisis in Pakistan. The second phase of the Sahiwal Power Project 1320MW inauguration took place.
The Chief Minister Punjab, Shehbaz Sharif inaugurated…Read More